Mine construction drawing design is specific to project preliminary design scheme, according to the assessment results of preliminary design documents, various professional drawing engineering construction drawings, and modify or supplement the proper preparation of construction drawing design specification and supplementary equipment ordering list on the preliminary design.

Mine Construction Drawing Design

The construction drawing design should meet the following basic requirements

  • Meet all the equipment, material orders requirements;
  • To meet the requirements of production of non - standard equipment and metal structural parts;
  • Meet the well built, exploration, mining, ore dressing plant, the tailings project construction of civil, electrical, water supply and drainage and other aspects of construction drawings, as construction units bidding, construction budget and construction organization plan basis, construction units to strictly carry out construction operation according to the construction drawing;
  • As a completed and put into production and engineering basis for acceptance.